Illawara rail upgrading - July 2005 »  Viewing pict4476     [Image 13 of 76]  :: Jump To  
  First slide Previous slide      Show/Hide EXIF Info Index Page Start/Stop the slide show      Next slide Last slide  
Comment: Hurstville - down side of station.
pict4471 * Hurstville - Allawah side of Station. Spoil train waiting for path out of worksite. The locomotives on the work trains are a rolling museum. * 2560 x 1920 * (3.08MB)

pict4472 * Hurstville - Allawah side of Station. G set waiting for access to Hurstville's platform. Another spoil train waiting for path out of worksite. * 2560 x 1920 * (2.42MB)

pict4473 * Hurstville - down side of station. Spoil train leaving the work site. I don't know where they go from here. Next sidings are Waterfall. * 2560 x 1920 * (3.04MB)

pict4474 * Hurstville - down side of station. * 2560 x 1920 * (2.93MB)

pict4475 * Hurstville - down side of station. * 2560 x 1920 * (3.02MB)

Next slide
 
pict4476.jpg - 2560 x 1920 - (3.07MB)
5/07/05 13:07
pict4477 * Between Kogarah and Carlton. Track laying machine is about to reach the underpass where it will be cut out. They actually finished up at this point for the day and dragged the machine back to Rockdale. * 2560 x 1920 * (2.44MB)

pict4478 * Between Kogarah and Carlton. * 2560 x 1920 * (2.27MB)

pict4479 * Between Kogarah and Carlton. * 2560 x 1920 * (2.02MB)

pict4480 * Between Kogarah and Carlton. Locomotives on the track laying support train. * 2560 x 1920 * (2.2MB)

pict4481 * Between Kogarah and Carlton. Locomotives on the track laying support train. * 2560 x 1920 * (2.21MB)

Album last updated on 7/07/05 18:09
Powered by JAlbum 5.2 and BluPlusPlus skin
(C) Matthew Geier 2005